How to extend the service life of down-the-hole drilling rigs? Analysis of the correct use of down-the-hole drilling rigs!

Publication Date: Aug 29, 2022

Rig installation and preparation


1. Prepare a rock drilling cavern. The specifications of the cavern can be determined according to the drilling method. Generally, the height of the cavern is 2.6-2.8 meters when drilling a horizontal hole, and the width of the cavern when drilling an upward hole, downward hole or inclined hole It is 2.5 meters and the height is 2.8-3 meters.


2. Lead the gas and water pipelines, lighting lines, etc. to the vicinity of the working surface for use.


3. According to the requirements of the design of holes, erect the pillars firmly. The upper and lower ends of the pillar should be padded with wooden boards. After installing the horizontal shaft and the snap ring on the pillar according to a certain height and direction, use the hand winch to lift the machine, fix it on the pillar at the required angle, and then adjust the hole of the drilling rig. Towards.

1661738231259782.jpg

pre-job inspection


1. When starting work, carefully check whether the gas and water pipelines are firmly connected and whether there is any leakage of air or water.


2. Check whether the oiler has been filled with oil.


3. Check whether the screws, nuts, joints, etc. of each part have been tightened, and whether the uprights are indeed firmly supported.


Drilling procedure


When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get the proper thrust, and then pull the handle that controls the impactor to the working position. After rock drilling, the water valve can be opened to keep the gas-water mixture in the proper ratio. Carry out normal rock drilling work. 

When the advancing work moves the rod reel to collide with the drill, a drill rod is drilled. To stop the operation of the motor and stop supplying air and water to the impactor, insert the fork into the drill pipe groove of the drill holder, make the motor reverse the slide plate and retreat, so that the joint is disconnected from the drill pipe, and then connect the second drill pipe, press Here you work continuously in a loop.

Related News
Read More >>
Watch the 400XL Full Hydraulic Core Drill in Action in Zimbabwe: Real Customer Feedback and Performance Insights!Watch the 400XL Full Hydraulic Core Drill in Action in Zimbabwe: Real Customer Feedback and Performance Insights
Feb 10, 2025
Why You Should Watch This Video:** - **See the 400XL in Action**: Watch how the **400XL** drills through rock and soil, demonstrating its exceptional power and speed. - Real Customer Feedback: Hear directly from our customer in Zimbabw ...
Unleash Powerful Drilling with the HW-FSL400 Pneumatic Reverse Circulation Drill: Efficiency, Durability, and Precision at Its BestUnleash Powerful Drilling with the HW-FSL400 Pneumatic Reverse Circulation Drill: Efficiency, Durability, and Pr
Feb 06, 2025
The HW-FSL400 Pneumatic Reverse Circulation Drill is your go-to solution for high-efficiency, high-precision drilling. Whether you're working in harsh terrains or need to drill deep boreholes, this machine guarantees reliable results. If you’ ...
Discover the Power of the HWL390H Solar Pile Driver: Efficiency, Durability, and Innovation for Solar ProjectsDiscover the Power of the HWL390H Solar Pile Driver: Efficiency, Durability, and Innovation for Solar Projects
Jan 15, 2025
solar pile driver, HWL390H solar pile driver, solar panel foundation installation, hydraulic pile driver, efficient pile driving equipment, solar energy installation equipment, solar farm construction, eco-friendly pile driver, fast solar pi ...
All products are guaranteed for 12 months!